Spanish Fork, UT — Spring has sprung and the Spanish Fork FitCity Center is full of life inside and outside. Progress is made each day towards completion this fall.
The construction of the building is split into three areas, A, B, and C. Area A includes the locker rooms and indoor pool area - excluding the competition pool. Area B includes the competition pool, boiler, electrical, and chemical storage. Area C includes the community/senior center, multipurpose gym, fitness area and track, and administrative offices.
Structure Updates
Area A:
- Pool Footings nearing completion
- Pool wall panels assembly
- Exterior glass is being installed
- Tiling in changing rooms is being installed
Area B:
- Pool Structure work in progress
- Caulking of competition pool bleachers ongoing
- Exterior glass complete
Area C:
- Lower roof membrane complete
- Metal Panels nearing completion
- Metal stud framing work ongoing
- Gym Overhead Rough ongoing
- Start drywall installation
Site Work:
- Curb and gutter has been installed
- Finish grade for paving
- Pavilion Steel is complete
- Landscaping has started
Timeline Updates
The project is still on track for a late-fall 2025 opening.