REC CENTER CONSTRUCTION UPDATE - August 2025

Spanish Fork, UT — The FitCity Center is entering the final months of construction and nearing the finishing touches! A lot is happening daily, even though much of it is on the interior of the building.

The construction of the building is split into three areas, A, B, and C. Area A includes the locker rooms and indoor pool area - excluding the competition pool. Area B includes the competition pool, boiler, electrical, and chemical storage. Area C includes the community/senior center, multipurpose gym, fitness area and track, and administrative offices.

Structure Updates

Area A:​

  • Pool tile and play structures are nearing completion
  • Faux rock is complete
  • Tiling in changing room is complete
  • Interior curtain wall metal trim is being installed
  • Pool structures and membrane are completed
  • Wood railing is nearly complete
  • Pool deck is being poured

Area B:​

  • Finalizing pool equipment
  • Handrail installation is in progress
  • Changing room tiling is complete
  • Curtain wall entrance is ongoing
  • Drinking fountains are installed

Area C:​

  • Drywall finishes are complete
  • Painting is proceeding​
  • Handrail installation is in progress around track​
  • Ceiling tiles are being placed
  • Lighting and electrical finishes are being installed​
  • Kitchen tiling is in progress
  • Gym equipment installation is progressing

Site Work:

  • Retention wall along river trail is complete
  • Pump house plumbing and pool equipment in progress​
  • Slide footings are being poured
  • Site concrete is moving ahead in preparation for asphalt​
  • Mechanical units are getting ready for start up
  • Landscaping is progressing
  • Parking lot lighting is in progress

Timeline Updates

The project is still on track for a late-fall 2025 opening.