Utility Rates
Utility rates shown below are effective September 21, 2026. These rates will first appear on bills issued at the beginning of November and due November 25. Some customers are billed under Schedule 2. Schedule 2 rates revert to Schedule 1 on the next January 1 following nine years after the account was established.
| Service | Residential | Commercial / Non-Residential |
|---|---|---|
| Power | Schedule 1: $22.13/month base Schedule 2: $26.78/month base 0–500 kWh: $0.06962/kWh 501–1,000 kWh: $0.09488/kWh 1,001+ kWh: $0.12016/kWh |
Schedule 1: $23.69/month base + $8.24/kW demand First 1,000 kWh: $0.12395/kWh Next 4,000: $0.09469/kWh Additional: $0.05913/kWh Schedule 2: $39.14/month base + $9.01/kW demand First 1,000 kWh: $0.12676/kWh Next 4,000: $0.09534/kWh Additional: $0.09212/kWh |
| Drinking Water | Schedule 1 base: $13.03/month Schedule 2 base: $17.20/month With PI: 0–6,000 gal: $1.28/1,000 gal 6,001–18,000: $1.56/1,000 gal 18,001+: $2.40/1,000 gal Without PI: 0–6,000 gal: $1.26/1,000 gal 6,001+: $1.55/1,000 gal |
Schedule 1 base: ¾–1" meter: $13.03 1½": $31.86 2": $56.64 3–4": $173.45 Schedule 2 base: ¾–1": $17.20 1½": $38.70 2": $68.80 3–4": $210.71 Usage: $1.26–$1.56 per 1,000 gallons |
| Pressurized Irrigation | Schedule 1 base: ¾–1": $13.03 1½": $31.86 2": $56.64 3–4": $173.45 Schedule 2 base: ¾–1": $17.20 1½": $38.70 2": $68.80 3–4": $210.71 |
Same meter-size rates as residential |
| Sewer | Schedule 1 base: 1" or smaller: $31.10 1½": $69.97 2": $124.40 3–4": $497.60 Schedule 2 base: 1" or smaller: $32.79 1½": $73.77 2": $131.16 3–4": $524.64 Usage: $3.67/1,000 gal |
Same meter-size base rates Usage: $3.67/1,000 gal |
| Garbage | $13.50/month per can 1 can required, maximum 2 |
$13.50/month per can Maximum 4 |
| Recycle | $8/month per can Voluntary, every other week |
$8/month per can Voluntary, every other week |
| Storm Drain | Schedule 1: $12.62 per ESU/month Schedule 2: $17.67 per ESU/month |
Schedule 1: $12.62 per ESU/month Schedule 2: $17.67 p |